gpr

Penetration Series
Penetration: GPR, 2012

Ground Penetrating Radar scan of the the Inglewood “Mill” Skateboard park, the first concrete skatepark in Canada, constructed in West Vancouver in 1977, buried in 1984.

 

cnc

Penetration Series
Dual Penetration: GPR + CNC, 2012

CNC-routered cedar shingles reclaimed from the Vinson house, West Vancouver, 1913, inscribed with data acquired from a Ground Penetrating Radar scan of the the Inglewood “Mill” Skateboard Park, the first skatepark in Canada, constructed in 1977, buried in 1984.

Approx. 18 in. tall each. Widths variable

trace

Trace (Flour Pour), 2011

Full-scale drawing of the Inglewood “Mill” skatepark. All-purpose flour.

 

survey

Survey, 2012

Aerosol field lining chalk drawing on top of the site of the Inglewood “Mill” skatepark.